We were contracted by Millane Contract Services to provide urgent support and access to Meridian point in Greenwich following a devasting fire. Working closely with the London fire brigade we rapidly erected access to the perimeter complete with a full temporary roof covering the damaged building. The curved front elevation required complex design integration to allow the scaffold to be fully freestanding whilst absorbing huge wind loads and preventing water ingress.
The scaffold was designed and erected in such a way that all building work to make safe and subsequently restore the building to its former glory were possible without costly adaptations. Working closely with the main contractor and other trades allowed us to create a structure that catered for all needs in an efficient manner.
The scaffold was designed and erected in such a way that all building work to make safe and subsequently restore the building to its former glory were possible without costly adaptations. Working closely with the main contractor and other trades allowed us to create a structure that catered for all needs in an efficient manner.